Darke County Board of Developmental Disabilities
Energy Efficiency & Conservation Block Grant - Part A: Wayne Industries HVAC;
Part B: Anthony Wayne School Boiler Replacement & HVAC Upgrades
The project consists of providing: Part A - Wayne Industries - up to 8 split air conditioning replacement units and 12 natural gas furnace replacement units; Part B - Anthony Wayne - up to 4 split air conditioning replacement units and 2 boiler replacement units.
>Advertisement for Bids
>Planholder's List
>Addendum No. 1
>Bid Tabulation
Greenville City Schools
Memorial Hall Masonry Restoration - Part A "Temporary Shoring"
The project consists of providing and installing temporary shoring for the north side of Memorial Hall, 215 West Fourth Street, Greenville, Ohio. Engineer's Estimate: $75,000.00.
>Advertisement for Bids
>Planholder's List
>Addendum No. 1
>Bid Tabulation
Village of New Bremen
Elk Drive Reconstruction
The project consists of the reconstruction of +/- 1050 ft. of existing street in the Teton Subdivision. The project will include removal of existing integral concrete curb/roadway for +/-550 ft. of the project, storm drainage improvements, new asphalt street, new curb & gutter and driveway approaches, and partial sidewalk replacement. Engineer's Estimate: $337,873.00.
>Advertisement for Bids
>Planholder's List
>Bid Tabulation
Village of Arcanum
Sanitary Sewer Separation Phase III - Contract E - Albright Street Reconstruction
The project consists of the reconstruction of 885 L.F. of Albright Street. The reconstruction shall include new waterline, storm sewer, aggregate base intermediate asphalt course, and surface asphalt course. Engineer's Estimate: $418,917.02.
>Advertisement for Bids
>Planholder's List
>Addendum No. 1
>Bid Tabulation
Darke County Board of Commissioners
Darke County Courthouse - Site Demolition & Rehabilitation
The project consists of the abatement of asbestos containing materials in three existing structures, demolition of five existing structures, site clearing, installation of storm drainage system including underground detention, and site rehabilitation including installation of aggregate fill and base. The properties are located in the block behind the Courthouse between West Fourth Street and West Fifth Street along the east side of Sycamore Street. Engineer's Estimate: $318,692.00.
>Advertisement for Bids
>Planholder's List
>Addendum No. 1
>Bid Tabulation
Village of New Bremen
Canal Street Parking Lot Improvements
The project consists of the reconstruction of Canal Street (south of Plum Street) and the adjoining parking lot including storm drainage, curb and gutter, and new sidewalk.
>Advertisement for Bids
>Planholder's List
>Bid Tabulation
Village of Arcanum
Sanitary Sewer Separation Phase III - Contract D - Sanitary Sewer And Water Line Improvements
The project consists of the installation of sanitary sewers, storm sewers, water lines and all related appurtenances.
>Advertisement for Bids
>Planholder's List
>Addendum No. 1
>Bid Tabulation
Family Health Services, Inc.
Landscaping Project
The project consists of providing design and landscaping services within the courtyard space and adjacent surrounding area.
>Advertisement for Bids
>Planholder's List
Family Health Services, Inc.
Dental Office and X-Ray Room Alteration Project
The project consists of the renovation of a 4,250 square feet office suite to be used for Dental Office use purposes with an additional 375 square feet for covered entryway. Work also includes 1,065 square feet of X-Ray room alternations (with sprinkler, fire alarm alterations and permitting to be provided by contractor).
>Advertisement for Bids
>Planholder's List
Village of Ansonia
Sanitary & Storm Sewer Separation - Part A
The project consists of the installation of storm sewers and catch basins, sanitary manhole rehabilitation, sanitary manhole replacement, manholes adjusted to grade, miscellaneous sanitary and sewer separation work, cleaning and televising of sewers and alternate bid work including the east mobile home park sanitary pump station rehabilitation.
>Advertisement for Bids
>Planholder's List
>Addendum No. 1
>Addendum No. 1 - Attachment 1
>Addendum No. 1 - Attachment 2
>Addendum No. 1 - Attachment 3
>Addendum No. 1 - Attachment 4
> Bid Tabulation
Village of New Bremen
Contract A - Alley Reconstruction 2009 and Contract B - Rummel Creek and Melrose Place Resurfacing
The project consists of Contract A - the reconstruction of three 10' wide asphalt alleys for a total length of +/-2800' including storm drainage as well as a new +/-560'-8" sanitary sewer and all appurtenances and Contract B - the milling and resurfacing of +/-2300' of existing asphalt streets in the Pioneer Subdivision.
>Advertisement for Bids
>Planholder's List
>Addendum No. 1
>Addendum No. 1 - Attachment 1
>Addendum No. 2 - Attachment 2
>Addendum No. 3 - Attachment 3
>Addendum No. 4 - Attachment 4
>Addendum No. 5 - Attachment 5
>Addendum No. 6 - Attachment 6
> Bid Tabulation
Village of Phillipsburg
West Main Street Reconstruction Project
The project consists of the reconstruction of 1100 L.F. of West Main Street. The reconstruction shall include new aggregate base, intermediate asphalt course and surface asphalt course.
>Advertisement for Bids
>Planholder's List
>Bid Tabulation
Village of Laura
Main & Pike Street Reconstruction
The project consists of new storm drainage, new asphalt street, new curb & gutter and driveway approaches, and partial sidewalk replacement as well as the replacement of water services and other miscellaneous items.
>Advertisement for Bids
>Planholder's List
>Addendum No. 1
>Addendum No. 2
>Addendum No. 3
> Bid Tabulation
Village of Phillipsburg
Community Center Accessibility Improvements Project
The project consists of the renovation of two restrooms, a new ADA automatic opener and controls for aluminum/glass entrance doors, a concrete approach for the building entrance, and two handicapped parking spaces.
>Advertisement for Bids
>Planholder's List
>Addendum No. 1
> Bid Tabulation
Village of Arcanum
Sanitary Sewer Separation Phase III - Contract C - Albright Street Storm Sewer Reroute
The project consists of the installation of storm sewers and all related appurtenances.
>Advertisement for Bids
>Planholder's List
>Addendum No. 1
>Addendum No. 2
>Bid Tabulation
Village of Potsdam
Main Street Reconstruction
The project is for complete reconstruction of +/-2100 ft. of existing asphalt street.
>Advertisement for Bids
>Planholder's List
>Bid Tabulation
Village of New Bremen
Rotary Centennial Park Improvements
The project is for the enclosure of +/-94' of the Miami and Erie Canal just north of Monroe St. (S.R. 274) with twin 60" diameter culverts and associated appurtenances.
>Advertisement for Bids
>Planholder's List
>Addendum No. 1
>Bid Tabulation
Richland Township Trustees
Richland Township Office/Storage Building with Limited Site Improvements
The project consists of a wood frame and wood truss steel siding facade and includes general construction work, plumbing and electrical work.
>Advertisement for Bids
>Planholder's List
>Addendum No. 1
>Addendum No. 2
>Addendum No. 2 - Attachment
>Bid Tabulation
Village of Potsdam
Northeast Storm Sewer Improvements
The project consists of the construction of storm sewers ranging in size from 12" -30" in diameter plus appurtenances such as catch basins, manholes and headwalls.
> Planholder's List
> Advertisement for Bids
>Addendum No. 1
> Bid Tabulation
Village of New Bremen
Fox Street & Elk Drive Reconstruction
The project consists of the complete reconstruction of +/- 1500 ft. of existing concrete streets in Teton Subdivision.
> Planholder's List
> Advertisement for Bids
> Bid Tabulation
Village of Laura
Pike Street Drainage Improvements
The project consists of the construction of storm sewers ranging in size from 12" -48" in diameter plus appurtenances such as catch basins, manholes and headwalls.
> Planholder's List
> Advertisement for Bids
>Addendum No. 1
>Addendum No. 1 - Attachment 1
>Addendum No. 1 - Attachment 2
>Bid Tabulation
|