This project included the complete reconstruction of the traffic circle containing the fountain. The original fountain which was donated by Mr. Fred Coppock in the early 1950’s was removed and replaced with a new fountain, new pavers, landscaping, and lighting. Mote & Associates provided engineering services for the structural and electrical design and coordinated the project for the Coppock Family. Construction was completed in Spring 2006.
Village of New Bremen
South Haven Subdivision Reconstruction
Village of New Bremen
Mr. Wayne York, Village Adm.
P. O. Box 27
New Bremen, Ohio 45869
(419) 629-2827
Mote & Associates, Inc. designed this street project located in an existing subdivision within the Village. The project consisted of ±3,600 L.F. of full pavement replacement including storm drainage as well as new curb & gutter and sidewalk. Estimated cost: ±$550,000.
Village of New Bremen
AUG Lock One Rehabiltation
(PID 78654)
Village of New Bremen
Mr. Wayne York, Village Adm.
P. O. Box 27
New Bremen, Ohio 45869
(419) 629-2827
Mote & Associates, Inc. provided engineering design services for this historic project. The project consisted of the reconstruction of Lock One (originally constructed in 1910) on the Miami-Erie Canal in the Village of New Bremen. The reinforced concrete structure will include operable wooden gates. Construction was completed in the Spring of 2007. Funding included an ODOT TEA Grant. This was an LPA Let Project through ODOT. Estimated cost: ±$900,000.
City of Tipp City
West Broadway Avenue Reconstruction
City of Tipp City
Mr. Scott Vagedes, P.E.,
City Engineer / Service Director
260 South Garber Drive
Tipp City, Ohio 45371
(937) 667-6305
Mote & Associates, Inc. designed this street reconstruction project that consisted of ±1,000 L.F. of full pavement replacement including storm, sanitary, and waterline replacement as well as new curb & gutter and sidewalk. Construction was completed in the Fall of 2004. Funding included OPWC Issue II. Estimated cost: ± $570,000.
Village of Versailles
McGreevey Road Reconstruction
Village of Versailles
Mr. Randy Gump, Village Adm.
177 North Center Street
Versailles, Ohio 45380
(937) 526-3294
Mote & Associates, Inc. designed and prepared detail construction plans for this street reconstruction project. The project consists of approximately 2600 ft. of complete road reconstruction. This project was completed in 2007. Funding included OPWC Issue II and ODOT. Estimated cost: ± $1,500,000.
|